FACILITIES

Assembly Operations, Coventry

assembly-operations-coventry

The 6,000m2 factory in Coventry has capacity to build 200,000 units per year of a range of products, using multiple flexible and scalable assembly cells.

Located three minutes from M6 Jn2 & M69, The Proving Factory is a modern automotive Tier 1 building that was renovated & upgraded 2014 to optimise natural light with double skinned skylights, new LED lighting and low emission gas heating.  The intruder & fire alarm systems were also upgraded in 2014.

The building includes 4 level docks, 2 covered logistics ramps with secure yards.  It has over 1,000 m2 of office and meeting space, together with ample staff parking with a separate entrance.

We are very proud of our facilities, having fully refurbished them to an excellent finish, with a high impact floor, bright white walls and well maintained grounds.

The reconfigurable assembly cells used by The Proving Factory require less time to set up, getting your product to market faster and at lower cost.  We combine this with automotive grade process development to ensure repeatable, high quality production.

The site operates to ISO9001 & ISO14001 standards.

Product Realisation Centre, Coventry

product-realisation-centre-coventry

The PRC is our purpose built in-house pre-production workshop.  It offers 100 m2 of controlled, clean and dedicated development space adjacent to the assembly operations.  Air conditioning and heating ensures cleanliness and thermal stability, while individually configurable key fob access ensures security and confidentiality.

Component Manufacturing, Rotherham

component-manufacturing-rotherham

Using state of the art 5 axis CNC machines, coordinate measuring machinery and expertise in materials application, we can develop manufacturing processes, make pre-production components and deliver production manufacturing of up to 2 million parts per year to AS9100 & ISO9001 quality standards.